1. Home
  2. Platform
  3. OEE dashboard

OEE dashboard

See how effectively your machines really run.

The OEE dashboard calculates availability, performance and quality automatically from machine data. No spreadsheets, and no more discussion about which figures are right.

Two colleagues discussing production in a machine hall

Line B · this shift

Example

Lathe 07

Running

Lathe 08

Changeover

Explanation

OEE in one formula

Overall Equipment Effectiveness shows which share of the planned production time really delivers good products. It is the product of three factors.

Availability

Did the machine run when it was scheduled to?

Loss: breakdowns, changeovers, waiting

×

Performance

Did it run at the ideal speed?

Loss: small stops, reduced speed

×

Quality

Was the product right first time?

Loss: scrap, rework

=

OEE

The share of planned time that delivers good products.

Honest figures

No OEE percentage resting on an assumption

An OEE of 78% that rests on an assumption becomes a fact in a meeting. That is why every number shows what it is based on, and a factor stays empty if the data is missing. You fill the dashboard step by step.

1 · Machine connected

Straight away: current state, status history per hour, stops and the time between failures.

2 · Part counter

Parts per hour. The gateway itself suggests which signal is the counter, with the evidence. You confirm.

3 · Planned time

Availability, from the schedule in the ERP, a shift pattern, or otherwise the measured operating window.

4 · Cycle time

Performance, from a cycle time per item, the standard time from the ERP, or the fastest measured cycle.

5 · Good and rejected

The full OEE, with scrap from the ERP or entered per shift on the shop floor.

6 · Six big losses

With downtime reasons you see which of the six big losses is pushing your OEE down.

What you see

A tile never disappears

All tiles exist from day one. A tile that cannot be filled yet tells you what it needs: connect this, and I will fill myself.

  • The basis with every number: measured, from a standard or not available
  • A 0 is never used where “unknown” belongs
  • A suggestion is never applied silently
  • Every screen calculates with the same definition, including your own BI tool
  • A guided assistant that helps you connect
Screen with production dashboards

What it delivers

One number, and see exactly what is behind it

The OEE score is the start. The dashboard also shows which of the three factors is pushing your score down, and why.

  • Calculated automatically from machine signals
  • Comparable per machine, line, shift and site
  • Linked to stops and time between failures
Production hall with a row of CNC machines

Improving together

One version of the truth in the meeting

Production, maintenance and management discuss the same figures instead of each their own overview. That saves discussion and makes improvements measurable.

Combine with downtime analysis

Features

Everything in the OEE dashboard

OEE per machine and line

From factory level down to one machine.

Three factors separately

Availability, performance and quality visible separately.

Per shift

Compare shifts on the same line.

Trends

See the effect of improvements over time.

Multiple sites

Sites comparable in one overview.

Link with downtime

From OEE loss straight to the stops behind it.

Reports

Overviews for meetings and management.

In your own BI tool

The same definitions, directly readable in your own BI tool.

Frequently asked questions

About OEE

Want to know more? Read the detailed explanation in the knowledge base.

What is a good OEE score?

That differs per sector and process. An OEE of 85% is often called world class, but many factories are well below that. More important than the number is that you see which losses you can tackle.

How is OEE calculated?

OEE is availability × performance × quality. If a machine runs 90% of the planned time, at 95% of the ideal speed, with 98% good products, the OEE is about 84%.

Do operators need to enter anything?

No. Availability and performance come from machine data. Quality needs good and rejected parts; that comes from the ERP, or the operator enters it per shift.

Why do I sometimes see no OEE percentage?

Because a factor is missing, for example good and rejected parts. The dashboard then leaves the OEE empty and tells you what is missing, instead of showing a number that rests on an assumption.

Can we measure the effect of improvement projects?

Yes. Because performance is measured continuously, you see the effect of an improvement in the figures. That way you assess investments on real data instead of expectations.

Can we compare sites with each other?

Yes. Because the calculation is the same everywhere, you can put machines, lines and sites side by side fairly.

Combine with

Works together with

Downtime analysis

Every stop recorded automatically with start and duration. See which machines stop most often and for longest.

About downtime analysis

ERP and CAM integration

Orders as a work list per machine, the drawing with the item and the completion report back to the office.

About the ERP integration

Live trends, history and limits for every brand. See what happened just before a breakdown.

About the data analyser

See your OEE at a glance

In a personal demo we show how the OEE dashboard works with your machines and shifts.