OEE dashboard
See how effectively your machines really run.
The OEE dashboard calculates availability, performance and quality automatically from machine data. No spreadsheets, and no more discussion about which figures are right.

Line B · this shift
Example
Lathe 07
Running
Lathe 08
Changeover
Explanation
OEE in one formula
Overall Equipment Effectiveness shows which share of the planned production time really delivers good products. It is the product of three factors.
Availability
Did the machine run when it was scheduled to?
Loss: breakdowns, changeovers, waiting
×
Performance
Did it run at the ideal speed?
Loss: small stops, reduced speed
×
Quality
Was the product right first time?
Loss: scrap, rework
=
OEE
The share of planned time that delivers good products.
Honest figures
No OEE percentage resting on an assumption
An OEE of 78% that rests on an assumption becomes a fact in a meeting. That is why every number shows what it is based on, and a factor stays empty if the data is missing. You fill the dashboard step by step.
1 · Machine connected
Straight away: current state, status history per hour, stops and the time between failures.
2 · Part counter
Parts per hour. The gateway itself suggests which signal is the counter, with the evidence. You confirm.
3 · Planned time
Availability, from the schedule in the ERP, a shift pattern, or otherwise the measured operating window.
4 · Cycle time
Performance, from a cycle time per item, the standard time from the ERP, or the fastest measured cycle.
5 · Good and rejected
The full OEE, with scrap from the ERP or entered per shift on the shop floor.
6 · Six big losses
With downtime reasons you see which of the six big losses is pushing your OEE down.
What you see
A tile never disappears
All tiles exist from day one. A tile that cannot be filled yet tells you what it needs: connect this, and I will fill myself.
- The basis with every number: measured, from a standard or not available
- A 0 is never used where “unknown” belongs
- A suggestion is never applied silently
- Every screen calculates with the same definition, including your own BI tool
- A guided assistant that helps you connect

What it delivers
One number, and see exactly what is behind it
The OEE score is the start. The dashboard also shows which of the three factors is pushing your score down, and why.
- Calculated automatically from machine signals
- Comparable per machine, line, shift and site
- Linked to stops and time between failures

Improving together
One version of the truth in the meeting
Production, maintenance and management discuss the same figures instead of each their own overview. That saves discussion and makes improvements measurable.
Features
Everything in the OEE dashboard
OEE per machine and line
From factory level down to one machine.
Three factors separately
Availability, performance and quality visible separately.
Per shift
Compare shifts on the same line.
Trends
See the effect of improvements over time.
Multiple sites
Sites comparable in one overview.
Link with downtime
From OEE loss straight to the stops behind it.
Reports
Overviews for meetings and management.
In your own BI tool
The same definitions, directly readable in your own BI tool.
Frequently asked questions
About OEE
Want to know more? Read the detailed explanation in the knowledge base.
What is a good OEE score?
That differs per sector and process. An OEE of 85% is often called world class, but many factories are well below that. More important than the number is that you see which losses you can tackle.
How is OEE calculated?
OEE is availability × performance × quality. If a machine runs 90% of the planned time, at 95% of the ideal speed, with 98% good products, the OEE is about 84%.
Do operators need to enter anything?
No. Availability and performance come from machine data. Quality needs good and rejected parts; that comes from the ERP, or the operator enters it per shift.
Why do I sometimes see no OEE percentage?
Because a factor is missing, for example good and rejected parts. The dashboard then leaves the OEE empty and tells you what is missing, instead of showing a number that rests on an assumption.
Can we measure the effect of improvement projects?
Yes. Because performance is measured continuously, you see the effect of an improvement in the figures. That way you assess investments on real data instead of expectations.
Can we compare sites with each other?
Yes. Because the calculation is the same everywhere, you can put machines, lines and sites side by side fairly.
Combine with
Works together with
Downtime analysis
Every stop recorded automatically with start and duration. See which machines stop most often and for longest.
ERP and CAM integration
Orders as a work list per machine, the drawing with the item and the completion report back to the office.
Data analyser
Live trends, history and limits for every brand. See what happened just before a breakdown.
See your OEE at a glance
In a personal demo we show how the OEE dashboard works with your machines and shifts.