The six big losses

The Six Big Losses divide all production losses into six recognisable groups. This is how you link each loss to availability, performance or quality.

Geautomatiseerde productielijn

The six big losses come from the TPM tradition, the Total Productive Maintenance approach. They divide everything that costs production time into six groups. Each group belongs to one of the three OEE factors.

Availability losses

  1. Breakdowns: the machine fails and has to be repaired before it can run again.
  2. Setup and adjustment: the time between the last good product of one order and the first good product of the next.

Performance losses

  1. Small stops: short interruptions of a few minutes, for example a jammed product or a sensor that briefly sees nothing. They are rarely recorded, but they add up considerably.
  2. Reduced speed: the machine runs, but slower than its ideal speed. Often because it causes problems at higher speeds.

Quality losses

  1. Start-up losses: scrap during start-up or after a changeover, before the process is stable.
  2. Production rejects: scrap and rework during stable production.

What do you gain from it?

The classification helps you move from an abstract OEE number to concrete actions. Low availability caused by changeovers calls for something different (better changeover preparation, for example) than low availability caused by breakdowns (maintenance). And small stops are rarely solved with maintenance, but often with a small adjustment to the machine or the infeed.

The difficulty is that you only see these losses clearly if you record them. Small stops and reduced speed in particular are hard to spot with the naked eye. That is where automatic downtime registration helps.