OEE without assumptions: why an empty tile beats a made-up number

Two of the three OEE factors need data the machine doesn’t provide. How to deal honestly with missing data, and why it pays off.

Twee collega's bespreken de productie in een machinehal

The arithmetic of OEE is simple: availability times performance times quality. The problem lies in the input. Two of the three factors need data that the machine itself does not provide.

What each factor needs

  • Availability: the status of the machine, and the planned time.
  • Performance: a part counter, and a cycle time.
  • Quality: good and rejected parts. That rarely comes from the machine.

The temptation of an assumption

If the cycle time is missing, it is tempting to fill in an average. If scrap is missing, you calculate with 100% quality. The dashboard then shows a nice number, say 78%. In the meeting that number becomes a fact, while it rests on an assumption.

A fallback ladder

A more honest approach: give each factor a series of sources, from precise to rough, and show with the number which source was used.

  • Planned time: the schedule from the ERP, otherwise a shift pattern that has been filled in, otherwise the measured operating window.
  • Cycle time: a cycle time entered per item, otherwise the standard time from the ERP, otherwise the fastest measured cycle.
  • Quality: good and rejected parts from the ERP, or entered by hand per shift.

A measured fallback is allowed: the fastest measured cycle is a measurement. An average that has been filled in is not.

A worked example

A machine runs for 6 hours within an 8-hour shift pattern: availability 0.75, based on the shift pattern. It makes 300 parts, and the fastest measured cycle is 60 seconds. That is 18,000 seconds ideal against 21,600 seconds of run time: performance 0.83, based on the fastest measured cycle. There is no scrap data. Then quality and OEE stay empty, with the message: good and rejected parts missing.

Empty is not wrong

An empty OEE tile is not an error, but a task: this is still missing. That way your dashboard grows step by step towards a complete OEE, and you can trust every number along the way.

That is how the FactoryNebula OEE dashboard works too.