Recording a stop is one thing. Knowing why the machine stopped is what you can act on. That depends entirely on the list of causes operators choose from.
Start with planned or unplanned
The first split is the most important one: was the stop planned or not? Planned maintenance, breaks and scheduled changeovers should look different in your analysis than breakdowns. Mixing the two up leads to the wrong conclusions.
An example of a workable classification
- Breakdown: mechanical, electrical, control system
- Changeover: product change, tool change
- Waiting: for material, for an operator, for quality release
- Planned: maintenance, break, cleaning
- External: power failure, a full buffer or an empty infeed caused by another machine
Two levels are usually enough. Use the first level for the big picture and the second for targeted improvement actions.
Tips for a list that gets filled in
- Keep the first level under ten options.
- Use the words used on the shop floor, not those of the management report.
- Avoid ‘other’ as the default choice. Regularly check what ends up there and, if needed, turn it into a category of its own.
- Let the list differ per machine type where that makes sense. An injection moulding machine has different stops than a press brake.
Keep refining
A classification is never right first time. After a few weeks, plan a short review with operators and maintenance: which causes are never chosen, and where do people keep hesitating? See also Recording downtime: where do you start?.