
Connecting machines
Siemens, FANUC, Heidenhain, Allen-Bradley, OPC UA, Modbus and peripherals. No PLC programming, in the same form for every brand.
Plastics processing
Mould changes, start-up scrap and cycle times that slowly creep up: see per machine where capacity leaks away and link process data to quality.

Production · live
Example
Injection moulding machine 07
Running
Extrusion line 2
Starting up
Sound familiar?
Every industry loses time in its own way. These are the challenges we encounter most often in plastics processing.
A mould change quickly takes a lot of time. Exactly how long, and per mould, is often unclear without measurement.
After every change or stop it takes a while before the process is stable. That scrap often stays out of view.
A cycle time that is a few percent too high goes unnoticed, but costs a lot of capacity over a week.
Temperature, pressure and time determine product quality. If you record them, you find the causes of scrap faster.

What you measure
FactoryNebula reads the data from your machines automatically, without you having to overhaul your production process.
The platform
Start with the module that answers the biggest question, and expand when you are ready.

Siemens, FANUC, Heidenhain, Allen-Bradley, OPC UA, Modbus and peripherals. No PLC programming, in the same form for every brand.

A real-time overview of all your machines: what is running, what is stopped and since when. On the shop floor and in the office.

Availability, performance and quality from machine data, with every number showing what it is based on. No percentage that rests on an assumption.

Every stop recorded automatically with start and duration. See which machines stop most often and for longest.

If this, then that, without programming. Respond to a signal, send a command or report an order complete.

Orders as a work list per machine, the drawing with the item and the completion report back to the office.
Yes. By comparing the actual cycle time with the ideal one, you see performance loss that isn’t noticeable to the naked eye.
Yes. In the data analyser you put temperature, pressure and cycle time from around that moment side by side, and with a limit you get warned earlier from then on.
Not for reading. Injection moulding machines with OPC UA, Modbus or a Siemens PLC are read over the network. We look at which connection fits per machine.
Further reading
The Six Big Losses divide all production losses into six recognisable groups. This is how you link each loss to availability, performance or quality.
Calculate OEE step by step with a worked example of one shift, including the quick cross-check and the mistakes that are often made.
How to record process data automatically, so you can look back at what happened per batch or order. An audit becomes verification instead of reconstruction.
In a personal demo we show how the platform works with your machines, and where you can best start.